Full project details
- Timeline
- Sold April 28, 2026. Build ran June 1 to June 24, 2026 (24 calendar days), with two approved change orders. Project closed out June 29, 2026.
The challenge
Before this project, a back corner of this Redwood City yard held raised metal garden beds and trellises on gravel, with a low wall of stacked blocks edging the planting along a dark board fence and a tall hedge beyond.
The space was not functional and lacked cohesion with the rest of the property. The plan was to bring in new landscape and hardscape that would complement work already done on the property, and to make the space more usable with pavers, planting and additional hardscape.
Our approach
Sequoia Outdoor turned the garden corner into a paved patio and added hardscape and planting to make the space more usable. Three black 6 in. NDS square grate drains were set in the paved area and connected with 40 ft of 3 in. SDR-35 drain pipe, and 53 ft of 1 in. PVC conduit was trenched and backfilled, with wiring and connection by an electrician not included. Over geotextile fabric, the crew laid 684 sq ft of large-format pavers, 16 in. and larger, and locked the joints with G2 Alliance polymeric sand. An existing wall or footing was demolished and hauled away, and a new low wall of 41 CMU blocks went up, faced with veneer and finished with 27 ln ft of wall cap. A 64 sq ft, 6 in. concrete slab was formed, reinforced with rebar, placed with a trailer pump and broom finished. Along the side fence, an 18 ln ft redwood side screen, 8 ft tall and built from 2x2 redwood, went up, and the work also included 43 ln ft of pressure-treated 2x6. Around the yard, 279 sq ft of pea gravel was stabilized, 61 sq ft of decorative rock went down over weed cloth, 2 in. of soil was removed across 176 sq ft, and 864 elfin thyme plugs and 123 sq ft of dymondia were planted.The outcome
The garden corner is now a large-format paver patio holding a spa and chairs around a fire bowl, with three square drain grates set flush in the paving. The 8 ft redwood slat screen stands along the side fence, a low veneered wall fronts the planting along the back fence, and the same pavers run down the side yard past a planting strip. Elsewhere in the yard, a bed crossed by a line of stepping stones is planted with elfin thyme and dymondia. The build ran June 1 to June 24, 2026, and the project closed out June 29.Before and after