Case study
Paver Patio, Artificial Turf and Stepping-Stone Paths in Burlingame
A bare Burlingame backyard built out with a 1,223 sq ft Belgard paver patio, 650 sq ft of artificial turf over gopher wire and 44 stepping stones in 910 sq ft of cobble, plus four square grate drains, a run of redwood fence and three wood-plank gates.

- Location
- Burlingame
- Scope
- Artificial Turf
- Completed
- September 2026
- Project size
- 2783
- Investment
- $87,100–$101,700
Full project details
- Timeline
- Sold July 7, 2026. Build wrapped September 4, 2026, with two approved change orders. Project closed out September 15, 2026.
The challenge
This Burlingame backyard runs along the back of a single-story house, past a wall of sliding glass doors, and continues down a narrow side yard beside a breeze-block wall. Before the project it was bare dirt and weeds from the house out to the fence line.
The owners wanted the space built up so it could be used, with new hardscape and landscape laid out as a functional space for hosting.
Our approach
Sequoia Outdoor started by clearing the site: a medium tree and six shrubs came out, 2 in. of soil was removed across 500 sq ft, and everything was hauled away. Four 6 in. NDS square grate drains went into the patio base, connected with 3 in. SDR-35 pipe, with a downspout adapter and a concrete cut and patch for the pipe tie-in. The crew then laid 1,223 sq ft of Belgard Dimensions 18 three-piece pavers in the premium Victorian color around the back and side of the house, ran a dark border along the edges and around the existing steps, and locked the joints with G2 Alliance polymeric sand. Forty-four Belgard Dimensions 24x36 slabs in Scandina Gray were set as stepping stones along the house, around the turf and down the side yard, in 910 sq ft of 1 to 2 in. cobble over weed cloth. In the back corner, 650 sq ft of Monarch Bay 72 artificial turf went down over gopher wire with Envirofill infill, inside 100 ln ft of black steel edging. New fencing finished the side yards: 12 ln ft of 6 ft redwood good-neighbor fence and three wood-plank gates.The outcome
The finished yard has 1,223 sq ft of Belgard paving around the back of the house, framed by a dark border, with square drain grates set flush in the surface. Stepping stones in Scandina Gray cross 910 sq ft of cobble along the house, around the turf and down the side yard. The 650 sq ft of artificial turf fills the back corner inside steel edging, and new redwood fencing and three wood-plank gates close off the side yards. The build wrapped September 4, 2026, and the project closed out September 15.Build highlights

Clearing and excavation
A medium tree and six shrubs came out and 2 in. of soil was removed across 500 sq ft, with everything hauled away, clearing the bare yard for the new layout.

Drains set in the base
Four 6 in. NDS square grate drains were set in the gravel base and connected with 3 in. SDR-35 pipe, with a downspout adapter and a concrete cut and patch for the pipe tie-in.

Belgard pavers and a dark border
1,223 sq ft of Belgard Dimensions 18 three-piece pavers in Victorian went down along the house, with a dark border cut in around the existing steps and G2 Alliance polymeric sand in the joints.

Stepping stones in cobble
Forty-four Belgard Dimensions 24x36 slabs in Scandina Gray were set as stepping stones along the patio edge, around the turf and down the side yard, then surrounded with 910 sq ft of 1 to 2 in. cobble over weed cloth.

Turf over gopher wire
650 sq ft of Monarch Bay 72 artificial turf went down over gopher wire, seamed, glued and nailed, with Envirofill infill and 100 ln ft of black steel edging holding the edges.

Fence and gates
12 ln ft of 6 ft redwood good-neighbor fence with posts every 8 ft, and three wood-plank gates in the same style, closed off the side yards.